Give every job a timeout that fits its normal runtime
A job without timeout-minutes can hang for six hours before GitHub stops it. Set each limit from the job's recorded p95 with about 2x headroom, so hangs fail in minutes and healthy runs never hit the limit.
Saves runner minuteslow risk
Signals in your baseline
- Jobs in the workflow files have no timeout-minutes, so they inherit the 360-minute default.
- The slowest-jobs table shows a p90 far above the p50, or cancelled jobs that ran for close to six hours.
- Annotations on cancelled jobs say the job exceeded the maximum execution time.
- Steps that wait on a simulator, an emulator, a service container or a download have no step-level timeout.
Why it works
GitHub cancels a job after 360 minutes unless the job sets timeout-minutes. A test stuck in a loop, a deadlocked process, a simulator that never boots or a download with no timeout holds the runner for that whole time. The job fails anyway, just hours later, after billing every minute on a hosted runner and keeping one runner out of the pool. A limit close to the job's real runtime turns the six-hour hang into a failure a few minutes after the job should have finished, and the author learns about it the same hour.
Apply it
Compute a starting limit for every job from the baseline JSON (--json output of the baseline script). The script takes the p95 of successful runs, doubles it and rounds up to the next 5 minutes:
python3 - /tmp/ci-baseline.json <<'EOF'
import json, math, sys
from collections import defaultdict
durations = defaultdict(list)
for run in json.load(open(sys.argv[1]))["runs"]:
if run["conclusion"] == "success":
for job in run["jobs"]:
durations[(run["workflow"], job["name"])].append(job["duration"] / 60)
for (workflow, job), minutes in sorted(durations.items()):
minutes.sort()
p95 = minutes[math.ceil(0.95 * len(minutes)) - 1]
limit = max(5, math.ceil(2 * p95 / 5) * 5)
print(f"{workflow} | {job} | {len(minutes)} runs | p95 {p95:.1f} min | max {minutes[-1]:.1f} min | timeout-minutes: {limit}")
EOF
Then set the limits on each job, and on steps that wait for something outside the job:
jobs:
lint:
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- uses: actions/checkout@v7
- run: make lint
integration:
runs-on: ubuntu-latest
timeout-minutes: 25
steps:
- uses: actions/checkout@v7
- name: Start services
timeout-minutes: 5
run: docker compose up --wait
- run: make integration-test
unit:
strategy:
matrix:
os: [ubuntu-latest, macos-latest]
runs-on: ${{ matrix.os }}
timeout-minutes: ${{ matrix.os == 'macos-latest' && 30 || 15 }}
steps:
- uses: actions/checkout@v7
- run: make unit-test
timeout-minutesis valid on jobs and on steps. There is no workflow-level setting.- Matrix jobs share one definition, and the baseline lists each leg separately. Use the slowest leg's number, or an expression on
matrixas in theunitjob when legs differ a lot. - A step-level limit stops a wait that will never finish (services, emulators, network fetches) and names the step that hung, which is easier to debug than a whole-job timeout.
- A job that calls a reusable workflow with
uses:can't settimeout-minutes. Set the limits on the jobs inside the called workflow. - Jobs with fewer than about 20 successful runs in the sample get a noisy p95. Round those up generously.
Keep it safe
- A limit that is too tight costs more than a missing one: every healthy run it cuts off needs a full rerun. Measure from runs that include cold caches, keep about 2x headroom, and raise the limit when a job grows for legitimate reasons instead of letting it trip.
- A job stopped by its timeout ends as
cancelled, notfailure. Required checks still block the merge, because cancelled doesn't count as passing. Retry bots, failure alerts and flaky-test tracking that only look forfailurewill miss timeouts unless you includecancelled. - A timeout bounds a hang, it doesn't fix it. When a job starts hitting its limit, find the step that hangs instead of raising the number.
- Don't pair timeouts with
continue-on-erroron test steps. A step that timed out and was allowed to continue reports a passing job with tests that never finished.
Verify
- Before merging, compare each new limit with the
maxcolumn from the script. No successful run in the sample should exceed its limit. - After a week, rerun the baseline. The p90 of the affected jobs should come down if hangs were inflating it, and total runner minutes should drop by roughly the hours hung jobs used to burn.
- Find jobs that hit a limit: list cancelled runs with
gh run list --status cancelled, then read a job's annotations withgh api "repos/{owner}/{repo}/check-runs/JOB_ID/annotations" --jq '.[].message'. A timeout says the job "has exceeded the maximum execution time". Each hit should be a real hang, not a slow healthy run.